| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Asphalt Pavement Milling | 20000 | square yard | $3.50 | $70,000.00 | Construction |
| Hot Mix Asphalt Concrete Paving (Type D) | 3000 | ton | $120.00 | $360,000.00 | Construction |
| Concrete Curb and Gutter Replacement | 5000 | linear foot | $45.00 | $225,000.00 | Construction |
| Concrete Sidewalk Replacement | 1000 | square foot | $15.00 | $15,000.00 | Construction |
| Storm Drain Inlet Replacement | 10 | each | $2,500.00 | $25,000.00 | Construction |
| Traffic Control and Detour Management | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Pavement Markings and Striping | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Utility Adjustments (Water/Sewer Manholes, Valve Boxes) | 50 | each | $800.00 | $40,000.00 | Construction |
| Mobilization and Demobilization | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Project Management and Supervision | 1 | lot | $150,000.00 | $150,000.00 | Professional Services |
| Contingency for Unforeseen Conditions | 1 | lot | $1,000,000.00 | $1,000,000.00 | Other |
| Erosion Control Measures | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Subgrade Preparation and Stabilization | 20000 | square yard | $5.00 | $100,000.00 | Construction |
| Estimated Bid Value | $2,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 3 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.