| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction dredging to deepen Cut-C (HB) to 49 feet MLLW | 1 | lot | $50,000,000.00 | $50,000,000.00 | Construction |
| Construction dredging to deepen Port Sutton Channel to 49 feet MLLW | 1 | lot | $50,000,000.00 | $50,000,000.00 | Construction |
| Construction dredging to deepen Port Sutton Turning Basin to 49 feet MLLW | 1 | lot | $50,000,000.00 | $50,000,000.00 | Construction |
| Construction dredging to deepen East Bay Channel to 49 feet MLLW | 1 | lot | $50,000,000.00 | $50,000,000.00 | Construction |
| Construction dredging to deepen Cut-D (HB) to 49 feet MLLW | 1 | lot | $50,000,000.00 | $50,000,000.00 | Construction |
| Construction dredging to deepen Port Sutton Terminal Channel to 44 feet MLLW | 1 | lot | $25,000,000.00 | $25,000,000.00 | Construction |
| Construction dredging to deepen East Bay Channel Extensions 1 and 2 to 41 feet MLLW | 1 | lot | $25,000,000.00 | $25,000,000.00 | Construction |
| Widening of Port Sutton Channel | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Widening of Port Sutton Turning Basin | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Widening of East Bay Channel | 1 | lot | $10,000,000.00 | $10,000,000.00 | Construction |
| Disposal of approximately 4.4 million cubic yards of dredged material in East Bay Placement Area, DMMA 2-D and DMMA 3-D | 4400000 | cubic yard | $5.00 | $22,000,000.00 | Construction |
| Estimated Bid Value | $300,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.