| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Evaluation of existing hydraulic, structural, and roadway conditions at Gardner Road stream crossing | 1 | project phase | $50,000.00 | $50,000.00 | Professional Services |
| Hydraulic Engineering Services (including capacity analysis and flood potential reduction) | 1 | project phase | $75,000.00 | $75,000.00 | Professional Services |
| Structural Engineering Services (for bridge structure design) | 1 | project phase | $120,000.00 | $120,000.00 | Professional Services |
| Roadway Engineering Services (for improved resiliency and public safety) | 1 | project phase | $60,000.00 | $60,000.00 | Professional Services |
| Permitting Services (all necessary local, state, and federal permits) | 1 | project phase | $45,000.00 | $45,000.00 | Professional Services |
| Preparation of Construction Documents (plans, specifications, and estimates) | 1 | project phase | $100,000.00 | $100,000.00 | Professional Services |
| Estimated Bid Value | $450,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in