Repair Punta Borinquen Lighthouse at USCG Base Borinquen, Aguadilla, Puerto Rico (PNUM 2993811)

Estimated Value: $300,000
Open Constructionsolicitation
Oct 26, 2026
—
Construction
solicitation
236220
HUBZONE
AI Summary
This is a pre-solicitation notice for repairs to the Punta Borinquen Lighthouse at USCG Base Borinquen in Aguadilla, Puerto Rico. The project involves surface preparation, spalling and rust repair, replacement of a metal door and louver window, and painting. The contract is anticipated to be set aside for HUBZone businesses, with an estimated value between $100,000 and $500,000. Interested HUBZone businesses must submit a statement of intent, proof of certification, experience, and bonding capability by September 11, 2026.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Asbestos Containing Material (ACM) and Lead Based Paint (LBP) investigation and analysis report 1 each $5,000.00 $5,000.00 Professional Services
Exterior surface preparation (high-pressure water, spot washing, stiff brush, cleaning solution) 3200 square feet $5.00 $16,000.00 Construction
Interior walls and metal stairway surface preparation (high-pressure water, spot washing, stiff brush, cleaning solution, LBP stripping) 2560 square feet $15.00 $38,400.00 Construction
Spalling damage repair on exterior wall and overhang (dry cutting and patching) 160 square feet $100.00 $16,000.00 Construction
Rust damage repair on roof level 1 lot $7,500.00 $7,500.00 Construction
Metal hatch access to roof replacement (2 square feet) 1 each $1,500.00 $1,500.00 Construction
Metal guardrails installation along roof edge 45 linear feet $150.00 $6,750.00 Construction
Entrance metal door replacement (5'10" W x 9'6" H, to match existing) 1 each $8,000.00 $8,000.00 Construction
Metal louver window replacement on first level (2'6" x 3'3", to match existing) 1 each $2,500.00 $2,500.00 Construction
Base coat and two coats of algae-resistant water-based elastomeric, high-build, acrylic coating on concrete surfaces 6000 square feet $12.00 $72,000.00 Construction
Rust converter treatment and rust resistant paint application on all metal surfaces 1 lot $10,000.00 $10,000.00 Construction
General labor, tools, equipment, materials, supervision, and transportation for project completion 1 lot $126,350.00 $126,350.00 Construction
Estimated Bid Value$300,000.00

Want the full details?

Sign up free to see the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Construction BidsSOLICITATION BidsClosing Soon All Bids