| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Riparian Planting Bench (100-foot wide) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Gravel Maintenance Path (entire reach) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Riprap Revetment (shoreline and island protection) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Island Construction (200x1500 ft, up to 3 ft deep water) | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Earth Moving and Grading | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Bank Shaping | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Rock Installation | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Water Management (during construction) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Fill Placement | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Topsoil Placement | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Estimated Bid Value | $10,200,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 4 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.