Home › Bids
› California › The project consists of removing the existing meter pit and
The project consists of removing the existing meter pit and office structure with attached restroom and replacing them with an approximately 390-square-foot prefabricated office building and a 170-square-foot prefabricated Americans with Disabilities Act (ADA)-compliant all-gender restroom building along with associated utility connections and site improvements.
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.