| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Culvert Replacement (including excavation, new culvert installation, backfill, and compaction) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Traffic Control (including signage, flagging, and temporary lane closures) | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Erosion Control Measures (including silt fences, sediment traps, and revegetation) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Site Preparation and Demolition (including existing culvert removal) | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Roadway Restoration (including paving, striping, and shoulder work) | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Estimated Bid Value | $350,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in