| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Steam System Preventive Maintenance Labor (Two-person crew) | 416 | hour | $400.00 | $166,400.00 | Facilities |
| Steam trap surveys | 1 | lot | — | — | Facilities |
| Pressure-reducing valve cleaning | 1 | lot | — | — | Facilities |
| Heat exchanger and steam converter inspection | 1 | lot | — | — | Facilities |
| Condensate tank, pump, and piping operation verification | 1 | lot | — | — | Facilities |
| Steam piping or valve leak identification and addressing | 1 | lot | — | — | Facilities |
| Meter operation verification | 1 | lot | — | — | Facilities |
| Water chemistry verification | 1 | lot | — | — | Facilities |
| Assistance with regulatory inspections | 1 | lot | — | — | Facilities |
| Parts and Materials for Steam System Maintenance | 1 | lot | — | — | Facilities |
| Emergency Call-back Services for Steam System | 1 | year | — | — | Facilities |
| Estimated Bid Value | $166,400.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.