| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Commercial school roofing layover (labor, supervision, equipment, tools, incidental materials) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Clean area of debris and unnecessary accessories | 1 | lot | $1,000.00 | $1,000.00 | Construction |
| Remove all gravel throughout entire roof | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Install 1 layer of 2.2” ISO board throughout the entire roof (including fasteners and plates) | 896.5 | square foot | $4.00 | $3,586.00 | Construction |
| Install 60mil GAF-TPO, or equivalent, throughout entire area of roof (including fasteners and plates) | 896.5 | square foot | $8.00 | $7,172.00 | Construction |
| Secure perimeter of TPO with termination bar at wall flashing throughout entire roof | 1 | lot | $2,500.00 | $2,500.00 | Construction |
| Weld all seams to manufacturer specifications and probe once all seams are cooled | 1 | lot | $3,000.00 | $3,000.00 | Construction |
| Install T-patch at all crossing seams | 1 | lot | $1,500.00 | $1,500.00 | Construction |
| Install all proper pipe boots and penetration details for any existing penetrations in roof | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Inspect and check all facets of roof and make sure installed to manufacturer specifications | 1 | lot | $1,000.00 | $1,000.00 | Construction |
| Clean up and haul off roof related debris | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Run magnetic roller | 1 | lot | $500.00 | $500.00 | Construction |
| All costs for needed equipment, labor, disposal, and materials to complete the job (overhead/profit) | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Warranty information as applicable | 1 | lot | — | — | Professional Services |
| Estimated Bid Value | $107,500.00 | ||||