New Meadows Range Barn

Estimated Value: $115,000
Open New 32 days left IdahoConstructionrfp
Oct 28, 2026
Nov 29, 2026 12:00 AM
Construction
rfp
237110
AI Summary
The US Forest Service is seeking proposals for the New Meadows Range Barn project in Idaho. This project involves significant renovations including roof replacement, lead-based paint abatement and removal, siding replacement, exterior painting, and waterline modifications. An optional component includes replacing the existing wood deck with a new metal deck.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Roofing removal (existing) 1 lot $3,000.00 $3,000.00 Construction
Plywood sheathing installation (over skip sheathing) 1 lot $4,000.00 $4,000.00 Construction
Ice/water shield installation (entire roof) 1 lot $2,500.00 $2,500.00 Construction
Corrugated metal roofing installation (new) 1 lot $15,000.00 $15,000.00 Construction
Lead-based paint abatement (rafter tails, soffit, fascia) 1 lot $7,000.00 $7,000.00 Construction
Painting (rafter tails, soffit, fascia) 1 lot $3,500.00 $3,500.00 Construction
Lead-based paint siding and felt paper removal 1 lot $4,000.00 $4,000.00 Construction
Plywood sheathing and building wrap installation (siding) 1 lot $5,000.00 $5,000.00 Construction
New siding installation (in-kind) 1 lot $12,000.00 $12,000.00 Construction
New trim installation (in-kind, windows, doors, corners) 1 lot $3,000.00 $3,000.00 Construction
Exterior painting (all new siding and trim surfaces) 1 lot $6,000.00 $6,000.00 Construction
Waterline replacement (10-feet, 1-inch SIDR 9 HDPE) 10 linear foot $50.00 $500.00 Construction
Hydrant relocation (2-feet east) 1 each $1,000.00 $1,000.00 Construction
New water hydrant installation 1 each $1,500.00 $1,500.00 Construction
Drainage basin installation (for new hydrant) 1 each $750.00 $750.00 Construction
Galvanized barb fitting replacement (with brass barb fitting) 1 each $250.00 $250.00 Construction
Wood decking and foundation piers removal (Optional) 1 lot $2,000.00 $2,000.00 Construction
New expanded metal decking with steps and metal frame fabrication/installation (Optional) 1 lot $15,000.00 $15,000.00 Construction
New foundation piers installation (for new deck, Optional) 1 lot $3,000.00 $3,000.00 Construction
Project Management and General Conditions 1 lot $20,000.00 $20,000.00 Professional Services
Estimated Bid Value$115,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 6 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 C04a_SF-1442_1240LT27Q0027.pdf View
📎 C04b_1240LT27Q0027.pdf View
📎 C04c_SOW_1240LT27Q0027.pdf View
+3 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in IdahoConstruction BidsRFP BidsClosing Soon All Bids