| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Full Depth Reclamation Method 2, 6-inch depth | 6800 | SQYD | $25.00 | $170,000.00 | Construction |
| Asphalt Concrete Pavement | 1250 | TON | $180.00 | $225,000.00 | Construction |
| Roadway Excavation | 400 | CUYD | $50.00 | $20,000.00 | Construction |
| Culvert Replacement | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| New Parking Area Construction (aggregate base and asphalt pavement) | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Concrete ABA Compliant Curb Ramp | 1 | each | $2,000.00 | $2,000.00 | Construction |
| ABA Compliant Parking Spot (striping and signage) | 1 | each | $500.00 | $500.00 | Construction |
| Concrete Aprons around existing structures | 1 | lot | $1,000.00 | $1,000.00 | Construction |
| Entrance Gates | 2 | each | $4,000.00 | $8,000.00 | Construction |
| Super Elevation Correction | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Traffic Control and Road Closures during construction | 1 | lot | $3,000.00 | $3,000.00 | Construction |
| Estimated Bid Value | $435,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 5 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.