| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Air-cooled DX units (replacement for geothermal heat pumps) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Dedicated Outside Air Unit (DOAS) for Main Kitchen | 1 | each | $75,000.00 | $75,000.00 | Construction |
| Electrical power infrastructure for new HVAC equipment | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| HVAC controls and building management system integration | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Ductwork modifications and new installations | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Piping modifications and new installations (excluding geothermal rough-in) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Rough-in and temporary capping of geothermal piping within building (Phase 1) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Estimated Bid Value | $750,000.00 | ||||