| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Unclassified excavation/grinding | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Asphalt concrete pavement repairs | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Sidewalk concrete pavement repairs | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Cold planing | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Crack sealing | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Asphalt concrete overlay | 1 | lot | $800,000.00 | $800,000.00 | Construction |
| Type I Central Plant Mixed Rubberized Emulsion-Aggregate Slurry | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Raising manholes to grade | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Raising water valves to grade | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Striping | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Mobilization/Clearing & Grubbing (Base Bid) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Water Quality Best Management Practices (Base Bid) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Asphalt Concrete overlay and slurry seal with excavation area dig outs of Zone D (Base Bid) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Related work (Additive Bid) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Estimated Bid Value | $3,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.