St. Lucie South Jetty Repair Industry Day

Estimated Value: $37,500,000
Open 33 days left FloridaConstructionother
Oct 30, 2026
Dec 7, 2026 9:00 AM
Construction
other
237990
Small Business
AI Summary
This is a Special Notice for an Industry Day event hosted by the U.S. Army Corps of Engineers, Jacksonville District, regarding the St. Lucie South Jetty Rehabilitation project. The event aims to gather information on industry capabilities and feedback before issuing a formal solicitation for FY2027 award. The project involves rehabilitating the head structure of the South Jetty, including rebuilding the head structure, foundation, and toe protection, with an estimated value between $25-$50 million and a performance period of 730 days.
🏆 Who won similar work here

Most recent contracts from Department of the Army under NAICS 237990, last 3 years. Typical award: $19.1M.

EMPIRE EQUIPMENT SERVICE, INC.$46.2MJul 2028Murrieta creek phase 2b details
MANSON CONSTRUCTION CO$13.3MFeb 2027Mississippi river, baton rouge to gulf, southwest pass hopper dredge contract nos. 1-2026 details
AGATE CONSTRUCTION COMPANY, INC.$53MNov 2026North jetty repairs, indian river inlet details
MARINEX CONSTRUCTION INC$19.1MSep 2026The scope of work includes the expansion of the cedar hammock range bend widener located … details
THE DUTRA GROUP$15.6MAug 2026Tampa harbor maintenance dredging egmont and mullet key cuts details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Rehabilitation of the head structure of the South Jetty at St. Lucie Inlet 1 lot $37,500,000.00 $37,500,000.00 Construction
Excavation of existing bed material for widened marine mattress foundation 1 lot $5,000,000.00 $5,000,000.00 Construction
Placement of 9- to 15-ton toe protection stones 1 lot $7,000,000.00 $7,000,000.00 Construction
Removal and disposal of asphalt walkway and other debris off-site 1 lot $1,000,000.00 $1,000,000.00 Construction
Repair of existing core and reworking of single layer of armor stone 1 lot $8,000,000.00 $8,000,000.00 Construction
Placement of second layer of 9- to 15-ton armor stone 1 lot $10,000,000.00 $10,000,000.00 Construction
Clearing of access routes and staging areas 1 lot $500,000.00 $500,000.00 Construction
Restoration of disturbed areas to pre-construction conditions 1 lot $1,000,000.00 $1,000,000.00 Construction
Estimated Bid Value$37,500,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 3 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 Industry_Day_Project_Narrative_SLSJ_20261015_FINAL.pdf View
📎 SLSJ_Plates_v4.1.pdf View
📎 00_10_00_Draft_CLIN_Schedule_SLSJ_20261014.pdf View