| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design-build services for new 2,500 sq ft welding shop | 1 | lot | $800,000.00 | $800,000.00 | Construction |
| Welding stations (including equipment) | 20 | each | $5,000.00 | $100,000.00 | Facilities |
| Soundproofing installation | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Concrete pad construction | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Roll-up door installation | 1 | each | $10,000.00 | $10,000.00 | Construction |
| Gravel access drive creation | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Handwashing sink installation | 1 | each | $2,500.00 | $2,500.00 | Facilities |
| Changing area with lockers (installation and lockers) | 1 | lot | $15,000.00 | $15,000.00 | Facilities |
| Relocation of existing welding stations and equipment | 1 | lot | $22,500.00 | $22,500.00 | Professional Services |
| Estimated Bid Value | $1,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 2 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.