| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Full Depth Reclamation (FDR) of asphalt surface course into subgrade | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Mixing Portland Cement into soil for stabilized base | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Traffic Control for road construction operations | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Grading operations | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Storm drainage installation/modification | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Subgrade preparation | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Graded Aggregate Base (GAB) installation | 1 | lot | $35,000.00 | $35,000.00 | Construction |
| Asphalt paving | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Signing & Marking (parking lot striping, signs) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Final stabilization (e.g., seeding, erosion control) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Estimated Bid Value | $350,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in