| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Concrete sidewalk pouring and installation | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Curb and gutter pouring and installation | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Driveway pouring and installation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Storm drainpipe construction and installation | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Catch basin construction and installation | 1 | each | $10,000.00 | $10,000.00 | Construction |
| Oak tree removal | 1 | each | $5,000.00 | $5,000.00 | Construction |
| Brick pavers installation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Estimated Bid Value | $350,000.00 | ||||