| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Construction of 30-foot long 9-foot by 4-foot reinforced concrete box culvert | 1 | lot | $350,000.00 | $350,000.00 | Construction |
| Streambank stabilization | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Sanitary sewer main relocation | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| Fiber optic cable relocation | 1 | lot | $70,000.00 | $70,000.00 | Construction |
| Electrical utility relocation | 1 | lot | $70,000.00 | $70,000.00 | Construction |
| Erosion and sedimentation control measures | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| Estimated Bid Value | $750,000.00 | ||||