Coleman Bridge HPU Integration

Estimated Value: $125,000
Closing Soon 6 days left VirginiaConstructionsolicitation
Oct 30, 2026
Nov 10, 2026 12:00 AM
Construction
solicitation
238210
AI Summary
This bid is for the integration of new hydraulic power unit (HPU) controls and limit switches for the movable grating and span lock platform on the Coleman Bridge, involving modifications to existing starter boxes and installation of new PLC control cabinets.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Modification of existing far side movable grating HPU starter box 1 each $7,500.00 $7,500.00 Construction
Installation of new PLC control cabinet on Pier 1N 1 each $25,000.00 $25,000.00 IT Hardware
Installation of new PLC control cabinet on far side span lock platform 1 each $25,000.00 $25,000.00 IT Hardware
Removal of existing fully seated movable grating limit switches 1 lot $2,000.00 $2,000.00 Construction
Installation of new movable grating fully seated limit switches 1 lot $8,000.00 $8,000.00 IT Hardware
Installation of new fully raised movable grating limit switches 1 lot $8,000.00 $8,000.00 IT Hardware
Installation of new rotary cam limit switch at far side span lock platform 1 each $3,500.00 $3,500.00 IT Hardware
Integration of new equipment into existing PLC and control system 1 lot $44,000.00 $44,000.00 IT Services
Estimated Bid Value$125,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in VirginiaConstruction BidsSOLICITATION BidsClosing Soon All Bids