| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design and Construction of new Route 670 Connection | 1 | lot | $15,000,000.00 | $15,000,000.00 | Construction |
| Design and Construction of Route 29 auxiliary lanes | 1 | lot | $8,000,000.00 | $8,000,000.00 | Construction |
| Right of way acquisition | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Traffic signals (design and installation) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Drainage systems (design and construction) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Signing and pavement marking (design and installation) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Stormwater management (design and construction) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Transportation Management Plan (development and implementation) | 1 | lot | $500,000.00 | $500,000.00 | Professional Services |
| Erosion and sediment control (design and implementation) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Utility relocations | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Estimated Bid Value | $35,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in