| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Project Management and Coordination (12-month design period) | 12 | month | $5,000.00 | $60,000.00 | Professional Services |
| WSDOT Coordination (Kickoff meeting and two design review meetings) | 1 | lot | $7,500.00 | $7,500.00 | Professional Services |
| Survey, Property Boundaries, and Basemap Preparation | 1 | lot | $25,000.00 | $25,000.00 | Professional Services |
| Stormwater Analysis and Utility Coordination (including SWPPP and water main replacement design) | 1 | lot | $35,000.00 | $35,000.00 | Professional Services |
| Cultural Resources Services (Section 106 compliance) | 1 | lot | $15,000.00 | $15,000.00 | Professional Services |
| Pedestrian Illumination Design (report, coordination, plans/details) | 1 | lot | $20,000.00 | $20,000.00 | Professional Services |
| Environmental Review, Permitting, and Mitigation (data collection, investigations, critical areas, CWA 401/404, HPA, SEPA, NEPA, biological assessment) | 1 | lot | $60,000.00 | $60,000.00 | Professional Services |
| Arborist Services | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Geotechnical Investigation and Infiltration Testing | 1 | lot | $20,000.00 | $20,000.00 | Professional Services |
| Civil Engineering Services | 1 | lot | $75,000.00 | $75,000.00 | Professional Services |
| Structural Engineering Services | 1 | lot | $30,000.00 | $30,000.00 | Professional Services |
| Phase 2 Construction Plans (detailed drawings, cover sheet, typical sections, details, demolition, erosion control) | 1 | lot | $90,000.00 | $90,000.00 | Professional Services |
| Estimated Bid Value | $450,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.