| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Pre-engineered, dip-galvanized 08ga steel box culvert (material only) | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Grading services for culvert installation | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Drainage system installation (related to culvert) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Erosion control measures (materials and installation) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Concrete work (e.g., headwalls, wingwalls, foundations) | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Asphalt paving (restoration of disturbed areas) | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Labor for culvert installation and associated site work | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Equipment rental/usage for culvert installation and site work | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Estimated Bid Value | $155,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 3 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.