| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Sidewalk Construction (Concrete, 4-inch thick) | 15000 | linear foot | $75.00 | $1,125,000.00 | Construction |
| Curb and Gutter Installation (Concrete) | 10000 | linear foot | $40.00 | $400,000.00 | Construction |
| ADA Compliant Ramps (Concrete) | 20 | each | $2,500.00 | $50,000.00 | Construction |
| Storm Drainage Improvements (Catch Basins, Pipes) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Traffic Control and Management | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Erosion Control Measures | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Site Preparation and Grading | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Project Management and Supervision | 1 | lot | $100,000.00 | $100,000.00 | Professional Services |
| Estimated Bid Value | $1,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.