16292 Steam Boiler Replacement

Estimated Value: $1,250,000
Open New 9 days left UtahConstructionrfp
Nov 2, 2026
Nov 12, 2026 1:00 PM
Construction
rfp
238220
AI Summary
This bid is for the upgrade of the heating infrastructure in building 1515 at Hill AFB, transitioning from a steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system.
πŸ† Who won similar work here

Most recent contracts from Department of the Air Force under NAICS 238220, last 3 years. Typical award: $251K.

DUNCAN MECHANICAL SERVICES, INC.$423KOct 2026Remove 250-ton air cooled chiller and provide new 250-ton trane(r) air cooled chiller wit… details
RCA CONTRACTING, INC.$2.3MOct 2026Maintenance, repair, and alteration of mechanical, electrical and electrical sub-systems … details
KITANIHON-KAKO CO., LTD.$180KSep 2026Hardened aircraft shelter (has) and north area boiler maintenance / inspection service, m… details
GRANT MECHANICAL INC$251KAug 2026Replacement of existing chiller and installation of new buffer tank at bldg 840. details
ROOTED OAKS CONSTRUCTION, LLC$166KAug 2026Project 26-3102, building 438, repair (replace) infrared heaters details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Project Management and Engineering Services for Boiler System Replacement 1 lot $150,000.00 $150,000.00 Professional Services
Demolition and Removal of Existing Steam Heat Exchanger System 1 lot $75,000.00 $75,000.00 Construction
Gas-Fired Hot Water Boilers (Commercial Grade) 3 each $40,000.00 $120,000.00 Facilities
Piping and Fittings for Hot Water Distribution System 1 lot $100,000.00 $100,000.00 Construction
Pumps and Valves for Hot Water System 1 lot $50,000.00 $50,000.00 Facilities
Control System and Automation for Hot Water Boilers 1 lot $75,000.00 $75,000.00 Facilities
Gas Line Installation and Upgrades 1 lot $60,000.00 $60,000.00 Construction
Electrical Work and Wiring for New Boiler System 1 lot $40,000.00 $40,000.00 Construction
Insulation for Piping and Boilers 1 lot $30,000.00 $30,000.00 Construction
Permits, Inspections, and Commissioning Services 1 lot $25,000.00 $25,000.00 Professional Services
General Construction Labor and Installation 1 lot $400,000.00 $400,000.00 Construction
Contingency for Unforeseen Conditions 1 lot $125,000.00 $125,000.00 Other
Estimated Bid Value$1,250,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 28 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

πŸ“Ž 16292_Solicitation__Boiler_Replacement_Amd_2.pdf View
πŸ“Ž RFI_Responses_10-16-2026.docx View
πŸ“Ž questions.docx View
+25 more