Kissimmee River Restoration (KRR) Project, S-69 Weir Repair

Estimated Value: $1,500,000
Closing Soon New 6 days left FloridaConstructionrfi
Nov 2, 2026
Nov 9, 2026 9:00 AM
Construction
rfi
237990
SMALL BUSINESS
AI Summary
The U.S. Army Corps of Engineers is seeking information from potential bidders for the repair of the S-69 weir structure, a key component of the Kissimmee River Restoration Project. This includes concrete cap demolition and repair, reinforcement installation, expansion joint work, and subsurface void investigation and repair of the driving slab. The project is anticipated to be a Firm Fixed Price contract awarded in fiscal year 2027.
🏆 Who won similar work here

Most recent contracts from Department of the Army under NAICS 237990, last 3 years. Typical award: $19.1M.

EMPIRE EQUIPMENT SERVICE, INC.$46.2MJul 2028Murrieta creek phase 2b details
MANSON CONSTRUCTION CO$13.3MFeb 2027Mississippi river, baton rouge to gulf, southwest pass hopper dredge contract nos. 1-2026 details
AGATE CONSTRUCTION COMPANY, INC.$53MNov 2026North jetty repairs, indian river inlet details
MARINEX CONSTRUCTION INC$19.1MSep 2026The scope of work includes the expansion of the cedar hammock range bend widener located … details
THE DUTRA GROUP$15.6MAug 2026Tampa harbor maintenance dredging egmont and mullet key cuts details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Partial concrete cap demolition at 29 expansion joint locations (36" on each side) 29 location $5,000.00 $145,000.00 Construction
Inspection and cleaning of existing concrete, steel bars, anchor studs, and steel sheet piles (blast cleaning for steel) 1 lot $75,000.00 $75,000.00 Construction
Drilling/burning of 2-inch diameter holes into sheet pile for closed stirrups 1 lot $50,000.00 $50,000.00 Construction
Installation of new closed-loop epoxy coated stirrups routed through sheet pile 1 lot $100,000.00 $100,000.00 Construction
Installation of new anchor studs welded to sheet pile 1 lot $80,000.00 $80,000.00 Construction
Provision and installation of new expansion joints 1 lot $40,000.00 $40,000.00 Construction
Repair of concrete caps with structural concrete (casting-in-place) 1 lot $250,000.00 $250,000.00 Construction
Driving slab subsurface void investigation (concrete coring) 1 lot $60,000.00 $60,000.00 Construction
Subsequent repairs to address separation of driving slab from sheet pile (grouting cored holes, filling gaps with CSLM/flowable fill) 1 lot $300,000.00 $300,000.00 Construction
Quality control and construction administration submittals 1 lot $150,000.00 $150,000.00 Professional Services
As-builts of the final repaired structure 1 lot $50,000.00 $50,000.00 Professional Services
Incidental related work and project management 1 lot $200,000.00 $200,000.00 Construction
Estimated Bid Value$1,500,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

📎 Combined_S-69_Weir_Concept_Drawings__Draft_.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in FloridaConstruction BidsRFI BidsClosing Soon All Bids