| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Stormwater Culvert Cleanout and Maintenance | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Concrete Infrastructure Improvements (Ramp replacements, sidewalk improvements, inlet replacements) | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Bridge and Guardrail Regular Maintenance, Repairs, and Replacements | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| ADA Sidewalk Construction along Telemark Drive (including drainage, ramps, and striping) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Fraser River Trail Extension Phase 1 (approx. 3/4-mile, including steep terrain work, rock walls, 1500 LF boardwalks, 10-ft wide asphalt paving, creek/ditch crossings, prefabricated bridge and abutments) | 1 | lot | $8,000,000.00 | $8,000,000.00 | Construction |
| Cistern Restoration | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Police Chief Recruitment Services | 1 | lot | $50,000.00 | $50,000.00 | Professional Services |
| Estimated Bid Value | $10,500,000.00 | ||||