| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Water Main Installation (various sizes and lengths) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Water Line Connections and Service Taps | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Hydrant Installation and Relocation | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Valve Installation and Replacement | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Site Preparation and Excavation | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Pavement Repair and Restoration | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Erosion Control and Stormwater Management | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Engineering Design and Consulting Services | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Construction Management and Oversight | 1 | lot | $200,000.00 | $200,000.00 | Professional Services |
| Environmental Permitting and Compliance | 1 | lot | $100,000.00 | $100,000.00 | Professional Services |
| Estimated Bid Value | $5,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.
Sign Up Free → Already have an account? Log in