USS BOXER (LHD-4), ALCO Model 251C Long Lead Time Material (LLTM) Replacement

Estimated Value: $500,000
Open New CaliforniaManufacturingother
Nov 4, 2026
—
Manufacturing
other
333618

Key questions

Where is the work?

California. It is listed with other open California government bids on BidsNexus.

Who can bid?

No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.

What NAICS code applies?

NAICS 333618 (Manufacturing).

What kind of solicitation is it?

Government bid in the Manufacturing category.

How do I respond?

Responses go through the agency's official posting on acquisition.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.

AI Summary
This is a sole source solicitation for Long Lead Time Material (LLTM) replacement parts for the USS BOXER (LHD-4), specifically ALCO Model 251C components. The Department of the Navy intends to contract with Fairbanks Morse Defense for these parts. This announcement is not a request for competitive proposals.
🏆 Who won similar work here

Most recent contracts from Department of the Navy under NAICS 333618, last 3 years. Typical award: $112K.

CENTRAL FLORIDA YAMAHA INC$52KJul 2026Suzuki marine parts details
AUSTAL USA, LLC$145KJul 2026Usns burlington exhaust bellow parts details
DEFENSE MARITIME SOLUTIONS, INC.$141KJul 2026Usns lucy stone psa - wartsila pump overhaul details
GENERAL TOOL COMPANY$112KJul 2026Exhaust duct details
EVERLLENCE MIDDLE EAST AND AFRICA L.L.C$16KJul 2026Valve block for the diesel propulsion engine onboard usns john lewis qt 30062026 mh rev1 details

Source: USAspending.gov. Similar work, not necessarily this exact contract.

Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
ALCO Model 251C Long Lead Time Material (LLTM) Replacement Parts 1 lot $500,000.00 $500,000.00 Other
Estimated Bid Value$500,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus the 4 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

+1 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in CaliforniaManufacturing BidsClosing Soon All Bids