ITB MORRISON ESTATES SEWER REHABILITATION

Estimated Value: $3,135,000
Open New Georgiarfq
Nov 9, 2026
—
—
rfq
237110

Key questions

Where is the work?

Georgia. It is listed with other open Georgia government bids on BidsNexus.

Who can bid?

No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.

What NAICS code applies?

NAICS 237110.

What kind of solicitation is it?

Request for Quote (RFQ).

How do I respond?

Responses go through the agency's official posting on cityofringgoldga.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.

AI Summary
This is an Invitation to Bid (ITB) for the Morrison Estates Sewer Rehabilitation project for the City of Ringgold, GA. The solicitation is for rehabilitation work on the sewer system in the Morrison Estates area. Specific details regarding the scope of work, required qualifications, and submission instructions are likely contained within the linked PDF document.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
2025 Ford Interceptor Pursuit Utility Vehicle 1 each $45,000.00 $45,000.00 Transportation
Preliminary Engineering Report, Design Services and Construction Administration for unspecified project 1 lot $150,000.00 $150,000.00 Professional Services
Paving, Leveling and Patching North St., Paul Croft Way (Short St) 1 lot $250,000.00 $250,000.00 Construction
Sidewalk Installation at Sparks St. and Boynton Dr. 1 lot $100,000.00 $100,000.00 Construction
Morrison Estates Sewer Rehabilitation 1 lot $500,000.00 $500,000.00 Construction
Energy Services Program 1 lot $200,000.00 $200,000.00 Professional Services
New 3500 4x4 Cab and Chassis Truck for Shop 1 each $60,000.00 $60,000.00 Transportation
Depot Bathroom Renovation 1 lot $75,000.00 $75,000.00 Construction
2025 Dodge Durango Pursuit for City of Ringgold Administration Dept. 1 each $40,000.00 $40,000.00 Transportation
Ringgold 6000 Gallon Bulk Fuel Tank 1 each $30,000.00 $30,000.00 Facilities
Ringgold Pool House Roof Installation 1 lot $50,000.00 $50,000.00 Construction
Ringgold City Hall HVAC Replacement 1 lot $150,000.00 $150,000.00 Facilities
Poplar Springs Road Water Treatment Facility (Pump House) and Transmission Water Line 1 lot $300,000.00 $300,000.00 Construction
Water Line Replacement Project WTP to Peters Lane Tank 1 lot $400,000.00 $400,000.00 Construction
Creekside Park Phase II Project 1 lot $250,000.00 $250,000.00 Construction
LMIG Paving 2024 1 lot $300,000.00 $300,000.00 Construction
Sewer Department Truck 1 each $70,000.00 $70,000.00 Transportation
New 4WD Tractor with Backhoe Attachment 1 each $80,000.00 $80,000.00 Facilities
Mini Compact Excavator 1 each $50,000.00 $50,000.00 Facilities
Estimated Bid Value$3,135,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in GeorgiaRFQ BidsClosing Soon All Bids