RFB for Microfiltration(MF) West Basement Acoustic Panel

Estimated Value: $15,000,000
Open CaliforniaComputer Hardwarerfq
Apr 15, 2026
Computer Hardware
rfq
AI Summary
This is a Request for Bids (RFB) from the Orange County Water District for a Microfiltration (MF) West Basement Acoustic Panel. The contract number is GWRS-2025-2 and the due date is April 8, 2025 at 15:00.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Construction Management and Inspection Services for Anaheim Lake Valve Vault 1 lot $500,000.00 $500,000.00 Construction
FPWP A01 Inspection and Refurbishment Services 1 lot $250,000.00 $250,000.00 Construction
ROTP B01 Pump Inspection and Refurbishment 1 lot $200,000.00 $200,000.00 Construction
Engineering and Hydrogeologic Services Santa Ana River Riverbed Filtration System Feasibility Study 1 lot $300,000.00 $300,000.00 Professional Services
2025 Asphalt Pavement Rehabilitation Design 1 lot $400,000.00 $400,000.00 Construction
Habitat Restoration Services in Prado & Orange County Facilities 1 lot $350,000.00 $350,000.00 Professional Services
Construction Management and Inspection Services for Bond Basin Slope Repair Contract No. SB-2025-1 1 lot $450,000.00 $450,000.00 Construction
Granular Activated Carbon Media Procurement, Delivery and Installation at the Fullerton Main Plant 1 lot $600,000.00 $600,000.00 Construction
Construction Management and Inspection Services for City of Santa Ana PFAS Treatment at John Garthe Reservoir 1 lot $550,000.00 $550,000.00 Construction
City of Fullerton Main Plant (Wells 5, 6 & 8) PFAS Water Treatment Plant ProjectContract No. FUL-2025-1 1 lot $1,500,000.00 $1,500,000.00 Construction
Talbert Barrier Injection Wells I-24 and I-25 Control Valve 1 lot $300,000.00 $300,000.00 Construction
Prado Basin Short Term Sediment Removal Compliance Project – Phase I 1 lot $700,000.00 $700,000.00 Construction
Anaheim Lake Valve Vault 1 lot $400,000.00 $400,000.00 Construction
Golden State Water Company Sherrill Well PFAS Water Treatment Plant 1 lot $1,200,000.00 $1,200,000.00 Construction
Bond Basin Slope Repair 1 lot $350,000.00 $350,000.00 Construction
Reverse Osmosis (RO) Valve Relocation 1 lot $250,000.00 $250,000.00 Construction
Microfiltration(MF) West Basement Acoustic Panel 1 lot $50,000.00 $50,000.00 Facilities
Annex Building Roof Replacement 1 lot $150,000.00 $150,000.00 Construction
Green Acres Project (GAP) Process Building Exterior Stair Replacement 1 lot $100,000.00 $100,000.00 Construction
Pre-Design Investigation Work Plan South Basin Groundwater Protection Project 1 lot $200,000.00 $200,000.00 Professional Services
Conceptual Design Plan for Interpretive Educational Tours at Prado Office 1 lot $75,000.00 $75,000.00 Professional Services
Engineering and Hydrogeologic Services Santa Ana River Riverbed Filtration System Feasibility Study 1 lot $300,000.00 $300,000.00 Professional Services
On-Call Environmental Services 1 year $250,000.00 $250,000.00 Professional Services
Purchase of One Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES) System 1 each $150,000.00 $150,000.00 Other
Flow Reversal Reverse Osmosis Retrofit Constructability Study 1 lot $100,000.00 $100,000.00 Professional Services
Construction Management Services for Prado Basin Short Term Sediment Removal 1 lot $650,000.00 $650,000.00 Construction
Estimated Bid Value$15,000,000.00

Want the full details?

Sign up free to see the agency name, contact info, and the original bid posting link.