| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Bathroom Demolition and Removal of Existing Fixtures | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Plumbing Installation (Pipes, Drains, Fixture Connections) | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Electrical Wiring and Fixture Installation (Lighting, Outlets, Ventilation) | 1 | lot | $6,000.00 | $6,000.00 | Construction |
| Tile Installation (Flooring and Walls) | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Bathroom Fixtures (Toilets, Sinks, Showers/Bathtubs) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Ventilation System Installation | 1 | lot | $3,000.00 | $3,000.00 | Construction |
| Painting and Finishing | 1 | lot | $2,500.00 | $2,500.00 | Construction |
| Construction Management and Oversight | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Estimated Bid Value | $50,000.00 | ||||
Sign up free to see the agency name, 6 documents, contact info, and the original bid posting link.