| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Site Preparation for Building Operations | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Demolition of Existing Structures | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Removal of Demolished Structures/Debris | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| EHRM Infrastructure Upgrades (Labor) | 1 | lot | $475,000.00 | $475,000.00 | Construction |
| EHRM Infrastructure Upgrades (Materials) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Estimated Bid Value | $750,000.00 | ||||