| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| HVAC System Assessment and Analysis | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| HVAC System Optimization Design and Engineering | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| HVAC System Component Upgrades/Replacements (e.g., dampers, sensors, controls) | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| HVAC System Control System Programming and Configuration | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| HVAC System Commissioning and Testing | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Estimated Bid Value | $50,000.00 | ||||