| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design Services for Kindergarten Construction | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Site Preparation and Excavation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Foundation Construction | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Structural Framing (Concrete/Steel) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Exterior Walls and Roofing | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Interior Construction (Walls, Flooring, Ceilings) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Plumbing System Installation | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Electrical System Installation | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| HVAC System Installation | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Windows and Doors Installation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Finishes and Fixtures (Painting, Hardware) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Landscaping and Exterior Works | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Project Management and Supervision | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Estimated Bid Value | $1,500,000.00 | ||||