Responses are due December 7, 2026 at 7:30 PM (local agency time). That is 12 days from today.
Hawaii. It is listed with other open Hawaii government bids on BidsNexus.
The notice sets this opportunity aside for Small Business businesses. Confirm eligibility in the solicitation documents.
NAICS 236220 (Construction).
Solicitation in the Construction category.
Responses go through the agency's official posting on sam.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
Most recent contracts from Department of the Army under NAICS 236220, last 3 years. Typical award: $13M.
| FEDVET CONSTRUCTION | $2,500 | Feb 2031 | Min guarantee details |
| DOYON TECHNICAL SERVICES, LLC | $487K | Jul 2027 | Pj00082-25 - provide and install all material and labor necessary to demo failed cmp, and… details |
| CONTI FEDERAL SERVICES, LLC | $44M | Jul 2027 | B-21 60 row south environmental protection shelters (eps) at ellsworth air force base (af… details |
| HOWARD W. PENCE, INC. | $13M | Apr 2027 | Construction contract for in ang small indoor arms range details |
| J KOKOLAKIS CONTRACTING INC | $24.1M | Feb 2027 | Radial forge infrastructure at wva, ny details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | AI est. unit price | AI est. total | Category |
|---|---|---|---|---|---|
| Construction of Munitions Maintenance and Inspection Facility (KNMD209085) | 1 | lot | $14,000,000.00 | $14,000,000.00 | Construction |
| Micro-pile Foundations for Munitions Maintenance and Inspection Facility | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Cast-in-Place Concrete for Munitions Maintenance and Inspection Facility (slab-on-grade, walls, capping beams, masonry) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Structural Framing and Enclosure for Munitions Maintenance and Inspection Facility (cold-formed metal, insulated metal panels, structural steel) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Standing Seam Metal Roofing for Munitions Maintenance and Inspection Facility (gutters, downspouts, weather barrier) | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Mechanical HVAC Systems for Munitions Maintenance and Inspection Facility (including 20-ton AC systems) | 1 | lot | $1,200,000.00 | $1,200,000.00 | Construction |
| Interior Plumbing for Munitions Maintenance and Inspection Facility | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Lightning/Grounding Protection for Munitions Maintenance and Inspection Facility | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Communication Infrastructure for Munitions Maintenance and Inspection Facility | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Fire Alarm-Mass Notification System for Munitions Maintenance and Inspection Facility | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Wet-Pipe Sprinkler Suppression System for Munitions Maintenance and Inspection Facility | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| MAC Pad (Material Assembly Center) Concrete Pad (1,167 SY) | 1167 | SY | $150.00 | $175,050.00 | Construction |
| Asphalt Pavement for MAC Pad Access and Egress | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Construction of Conventional Munitions Cube Storage Addition (KNMD209086) | 1 | lot | $14,000,000.00 | $14,000,000.00 | Construction |
| Micro-pile Foundations for Conventional Munitions Cube Storage Addition | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Concrete Wall Structures for Conventional Munitions Cube Storage Addition (12 in. thick, high-hazard) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Cast-in-Place Concrete Slabs for Conventional Munitions Cube Storage Addition | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Structural Steel Framing and Roof Joists for Conventional Munitions Cube Storage Addition | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Standing Seam Metal Roofing for Conventional Munitions Cube Storage Addition | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| New Asphalt Pavement for Conventional Munitions Cube Storage Addition Access | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Lightning and Grounding Protection Systems for Conventional Munitions Cube Storage Addition | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Integrated Fire Detection and Alarm Reporting Systems for Conventional Munitions Cube Storage Addition | 1 | lot | $700,000.00 | $700,000.00 | Construction |
| RAB Lighting Exterior Wall Packs (Applicable to both projects) | 1 | lot | $50,000.00 | $50,000.00 | Facilities |
| Estimated bid value (estimate) | $28,000,000.00 | ||||
Get a ready-to-send distributor quote request for these 23 items (copy, CSV or email) and a margin calculator. Sign up free.
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.