Responses are due November 23, 2026 at 10:00 PM (local agency time). That is 3 days from today.
Lakeside, Arizona. It is listed with other open Arizona government bids on BidsNexus.
No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.
NAICS 238220 (Construction).
Solicitation in the Construction category.
Responses go through the agency's official posting on pinetoplakesideaz.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal of existing waterline | 143 | linear feet | $25.00 | $3,575.00 | Construction |
| Removal of existing valve | 1 | each | $500.00 | $500.00 | Construction |
| Installation of 4-inch Schedule 40 PVC waterline | 245 | linear feet | $40.00 | $9,800.00 | Construction |
| Installation of 8-inch Schedule 40 PVC waterline | 114 | linear feet | $60.00 | $6,840.00 | Construction |
| Installation of precast underground vault | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Connections to existing irrigation system | 1 | lot | $2,500.00 | $2,500.00 | Construction |
| Connections to existing waterline system | 1 | lot | $3,500.00 | $3,500.00 | Construction |
| Installation of water truck fill station | 1 | each | $20,000.00 | $20,000.00 | Construction |
| Installation of duplex pump and associated appurtenances | 1 | each | $40,000.00 | $40,000.00 | Construction |
| Installation of Portland cement concrete pad | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Installation of new 4-inch gate valves | 2 | each | $800.00 | $1,600.00 | Construction |
| Installation of new 8-inch gate valves | 2 | each | $1,500.00 | $3,000.00 | Construction |
| Installation of 8-inch flap gate valve | 1 | each | $1,800.00 | $1,800.00 | Construction |
| Installation of electrical conduit | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Installation of steel bollards | 4 | each | $750.00 | $3,000.00 | Construction |
| Installation of wire-tied riprap for site protection | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Labor, materials, equipment, excavation, backfill, connections, testing, and incidental work (general construction services) | 1 | lot | $180,000.00 | $180,000.00 | Construction |
| Estimated Bid Value | $325,000.00 | ||||