Responses are due November 19, 2026 at 2:00 PM (local agency time). That is 3 days from today.
Chilton, Wisconsin. It is listed with other open Wisconsin government bids on BidsNexus.
No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.
NAICS 236220 (Construction).
Solicitation in the Construction category.
Responses go through the agency's official posting on co.calumet.wi.us. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Second Floor Courthouse Interior Remodel (Base Bid) | 1 | lot | $3,500,000.00 | $3,500,000.00 | Construction |
| Demolition of existing partition walls, ceilings, flooring, and finishes (2nd floor) | 52915 | sf | $5.00 | $264,575.00 | Construction |
| Steel stud and gypsum board wall construction (2nd floor) | 52915 | sf | $25.00 | $1,322,875.00 | Construction |
| CMU wall infill (2nd floor) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Acoustical and drywall ceilings (2nd floor) | 52915 | sf | $10.00 | $529,150.00 | Construction |
| New carpet (2nd floor) | 52915 | sf | $8.00 | $423,320.00 | Construction |
| Paint (2nd floor) | 52915 | sf | $3.00 | $158,745.00 | Construction |
| Restroom remodel finishes (2nd floor) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| New openings (2nd floor) | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| New mechanical system and unit replacement (2nd floor) | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Plumbing systems and fixture replacement (2nd floor) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Electrical systems (2nd floor) | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| Information technology systems (2nd floor) | 1 | lot | $150,000.00 | $150,000.00 | IT Services |
| Stair 01 Remodel (Alternate #1A) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Stair 04 Remodel (Alternate #1B) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Stair 05 Remodel (Alternate #1C) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Chiller 01 and Chiller 02 Integration (Alternate #2) | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Future Office Remodel (Area 219) (Alternate #3) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| First-Floor West Storefront door and window system replacement (Alternate #4) | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| Deduct: Removal of AC 6, 7, and 8 unit replacement (Alternate #5) | 1 | lot | $-150,000.00 | $-150,000.00 | Construction |
| Deduct: Removal of existing furring from exterior walls in Unit 'A', 'B', and BHU wing (Alternate #6) | 1 | lot | $-75,000.00 | $-75,000.00 | Construction |
| Estimated Bid Value | $5,000,000.00 | ||||