Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sidewalk Upgrades and Herndon EB Left-Turn Extension (12700465)

Estimated value: $2,050,000 (estimate, often AI-generated, not the agency's figure)
Closed CaliforniaConstructionsolicitation
This bid is closed โ€” responses were due November 17, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in California →
Oct 9, 2026
Nov 17, 2026 5:00 PM
Construction
solicitation
237310

Key questions

When is this bid due?

Responses were due November 17, 2026 at 5:00 PM. The bid is closed; see open bids like it below.

Where is the work?

Fresno, California. It is listed with other open California government bids on BidsNexus.

Who can bid?

No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.

What NAICS code applies?

NAICS 237310 (Construction).

What kind of solicitation is it?

Solicitation in the Construction category.

How do I respond?

Responses go through the agency's official posting on vendors.planetbids.com. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.

AI Summary
This bid is for a package of traffic and pedestrian infrastructure improvements, including new sidewalks, streetlights, left-turn lane extensions, traffic signal upgrades, ADA ramps, and crosswalks in the Bullard & Forkner and Herndon & Palm areas.
Line Items
ItemQtyUnitAI est. unit priceAI est. totalCategory
Sidewalk construction along south side of Bullard between Forkner and Van Ness 1 lot $400,000.00 $400,000.00 Construction
Streetlight installation along south side of Bullard between Forkner and Van Ness 1 lot $250,000.00 $250,000.00 Construction
Extension of existing left-turn lanes along Eastbound Herndon Avenue at Herndon and Palm intersection 1 lot $600,000.00 $600,000.00 Construction
Installation of protective left-turn phasing (traffic signal upgrade) 1 lot $200,000.00 $200,000.00 Construction
Installation of new ADA curb ramps 1 lot $300,000.00 $300,000.00 Construction
Installation of high visibility crosswalks 1 lot $150,000.00 $150,000.00 Construction
Installation of video detection (traffic signal system) 1 lot $150,000.00 $150,000.00 Construction
Estimated bid value (estimate)$2,050,000.00
Items are read from the notice by AI. Prices are AI estimates, not the agency's numbers: check the solicitation before pricing a bid.
๐Ÿงพ Distributor quote kit

Get a ready-to-send distributor quote request for these 7 items (copy, CSV or email) and a margin calculator. Sign up free.

Want the full details?

Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.

Email me bids like this every morning
We found 535 open Construction bids in California like this one.
Free. No password. One click in the email to start, unsubscribe any time. Have an account? Log in

๐Ÿ”„ Repeat buyer

This agency has posted 11 other Construction bids over 1 year, mostly due in October, November, December.
J
F
M
A
M
J
J
A
S
O
N
D
Plan ahead: reach the buyer and line up distributor pricing before their usual months. Sign up free to see the agency and its past bids.

Browse More Bids

Bids in CaliforniaConstruction BidsSOLICITATION BidsClosing Soon All Bids