| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| HVAC System Design | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| New HVAC Roof Top Units (RTUs) and Installation | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Electrical Equipment and Installation for New HVAC System | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Duct Smoke Detectors and Installation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Mold Abatement and Cleanup | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Water Damaged Area Removal and Restoration | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Interior Finishes Restoration (e.g., re-painting, ceiling tile replacement) | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Plumbing Sewer Line Repair/Replacement at Latrines | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| HAZMAT Survey (if not already completed and paid for, or for additional surveys) | 1 | lot | $25,000.00 | $25,000.00 | Professional Services |
| Cybersecurity Requirements for Renovation Project | 1 | lot | $75,000.00 | $75,000.00 | IT Services |
| Project Management and General Construction Services | 1 | lot | $450,000.00 | $450,000.00 | Construction |
| Estimated Bid Value | $3,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.