| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Furnish and install 480V, 3 PH, 30A feeder from existing panelboard to proposed aeration equipment disconnect | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Furnish and install 480V, 3PH, 30A disconnect, including grounding system, post, pipe bollards, and conduits | 1 | lot | $7,000.00 | $7,000.00 | Construction |
| Control panel with individual motor overload protection circuit breakers for microbubble lagoon aeration system | 1 | each | $6,000.00 | $6,000.00 | Construction |
| Self-contained floating microbubble aerator cord connected to control panel with tethers and anchors | 4 | each | $8,000.00 | $32,000.00 | Construction |
| Locate private and utility owned buried electrical lines and provide location on as-built plans with reference measurements | 1 | lot | $5,000.00 | $5,000.00 | Professional Services |
| Third-party inspection of electrical work included in this contract | 1 | lot | $7,000.00 | $7,000.00 | Professional Services |
| Estimated Bid Value | $65,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in