| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Fire Hydrant Replacement (per hydrant) | 50 | each | $4,000.00 | $200,000.00 | Construction |
| Excavation and Backfill (per hydrant location) | 50 | each | $1,000.00 | $50,000.00 | Construction |
| Water Main Tapping and Connection (per hydrant) | 50 | each | $500.00 | $25,000.00 | Construction |
| Pavement Restoration (per hydrant location) | 50 | each | $500.00 | $25,000.00 | Construction |
| Estimated Bid Value | $300,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in