Responses were due November 17, 2026 at 2:00 PM. The bid is closed; see open bids like it below.
Texas. It is listed with other open Texas government bids on BidsNexus.
The notice sets this opportunity aside for Small Business businesses. Confirm eligibility in the solicitation documents.
NAICS 238220 (Construction).
Request for Information (RFI) in the Construction category.
Responses go through the agency's official posting on sam.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
Most recent contracts from Federal Prison System / Bureau of Prisons under NAICS 238220, last 3 years. Typical award: $87K.
| KOVACS CONSTRUCTION CORPORATION | $593K | Oct 2026 | Replace fire pump details |
| MECHANICAL COOLING SERVICES, LLC | $98K | Oct 2026 | 25z5aj7-fcc pollock- emergency replace chiller no. 2 at fpc dorm 1 hvac unit eo 14398 details |
| WATER SOFTENER SERVICES LLC | $27K | Oct 2026 | 26z5az2 - emergency repair water softener doc bpq 15b50126pr000342 reserved on 07/20/2026 details |
| TRANE U.S. INC. | $87K | Oct 2026 | Contractor to provide services to the chiller bldg. 5756 (26z2bd8) details |
| INSPARISK, LLC | $20K | Oct 2026 | Insparisk, llc. for boiler. field notice #0007 mandatory use of national contract 15bnas… details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design and Engineering Services for HVAC System Replacement | 1 | lot | $1,000,000.00 | $1,000,000.00 | Professional Services |
| Removal and Disposal of Existing Direct Expansion (DX) Condensing Units and Associated Equipment | 10 | each | $15,000.00 | $150,000.00 | Construction |
| New Air-Cooled Packaged Chillers | 10 | each | $150,000.00 | $1,500,000.00 | Construction |
| New Chilled-Water Cooling Coils | 10 | each | $25,000.00 | $250,000.00 | Construction |
| Chiller Equipment Pads (Construction) | 5 | each | $50,000.00 | $250,000.00 | Construction |
| Temporary Chiller Landing Pads (Construction) | 5 | each | $20,000.00 | $100,000.00 | Construction |
| Chilled-Water Piping Systems (Installation) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Electrical Distribution Modifications and Upgrades | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Temporary Cooling Connection Stations (Installation) | 5 | each | $30,000.00 | $150,000.00 | Construction |
| Temporary Shore-Power Connection Stations (Installation) | 5 | each | $20,000.00 | $100,000.00 | Construction |
| BAS/DDC Controls Integration | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Contractor-Provided Temporary Cooling Services during Phased Construction | 1 | lot | $1,000,000.00 | $1,000,000.00 | Facilities |
| Testing, Adjusting, Balancing (TAB), Commissioning, Startup, Training, and Closeout Activities | 1 | lot | $1,500,000.00 | $1,500,000.00 | Professional Services |
| Project Management and Supervision | 1 | lot | $1,500,000.00 | $1,500,000.00 | Professional Services |
| Estimated Bid Value | $12,000,000.00 | ||||