Responses are due November 19, 2026 at 2:00 PM (local agency time). That is 1 day from today.
Texas. It is listed with other open Texas government bids on BidsNexus.
The notice sets this opportunity aside for small business businesses. Confirm eligibility in the solicitation documents.
NAICS 238220 (Construction).
Request for Information (RFI) in the Construction category.
Responses go through the agency's official posting on sam.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
Most recent contracts from Federal Prison System / Bureau of Prisons under NAICS 238220, last 3 years. Typical award: $87K.
| KOVACS CONSTRUCTION CORPORATION | $593K | Oct 2026 | Replace fire pump details |
| MECHANICAL COOLING SERVICES, LLC | $98K | Oct 2026 | 25z5aj7-fcc pollock- emergency replace chiller no. 2 at fpc dorm 1 hvac unit eo 14398 details |
| WATER SOFTENER SERVICES LLC | $27K | Oct 2026 | 26z5az2 - emergency repair water softener doc bpq 15b50126pr000342 reserved on 07/20/2026 details |
| TRANE U.S. INC. | $87K | Oct 2026 | Contractor to provide services to the chiller bldg. 5756 (26z2bd8) details |
| INSPARISK, LLC | $20K | Oct 2026 | Insparisk, llc. for boiler. field notice #0007 mandatory use of national contract 15bnas⦠details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Removal and disposal of three (3) existing Unilux hot water heating boilers | 3 | each | $15,000.00 | $45,000.00 | Construction |
| Furnish and install three (3) new Unilux ZF-1000W-FE boilers (brand name or equal) | 3 | each | $250,000.00 | $750,000.00 | Construction |
| Dual-fuel burners and controls for three (3) new boilers | 3 | each | $50,000.00 | $150,000.00 | Construction |
| Connection to existing piping for three (3) new boilers | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Connection to existing breeching for three (3) new boilers | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Connection to existing electrical service for three (3) new boilers | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Connection to Building Automation System for three (3) new boilers | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Hydrostatic testing of new boiler system | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Start-up and commissioning of new boiler system | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Project management, labor, equipment, tools, and incidentals for boiler replacement (excluding specific items above) | 1 | lot | $1,730,000.00 | $1,730,000.00 | Construction |
| Estimated Bid Value | $3,000,000.00 | ||||