Responses are due December 1, 2026 at 12:00 PM (local agency time). That is 5 days from today.
Columbus, Ohio. It is listed with other open Ohio government bids on BidsNexus.
No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.
NAICS 541511 (Information Technology).
Request for Quote (RFQ) in the Information Technology category.
Responses go through the agency's official posting on columbusvendorservices.powerappsportals.com. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
| Item | Qty | Unit | AI est. unit price | AI est. total | Category |
|---|---|---|---|---|---|
| Annual inspection fee per extinguisher - Includes testing, service and tagging of the entire inventory of approximately 1,200 fire extinguishers at multiple locations. All fire extinguishers in service are mounted throughout the plant, in vehicles, and in a storage area that will need physically inspected, swapped in and out, or replaced. A loaner of the same type and at least equal size shall be supplied while a unit is removed for service. Rechargeable extinguishers found with deficiencies shall be removed from service and corrective actions taken to return to service. Units that require hydrostatic testing shall be removed from service and a loaner put in place until testing is completed and unit is returned or replaced. Safety seals and tagging shall be included as part of the service. | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| 940 Dublin Road Haz Mat Building Fire Suppression System Inspection | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Trip Charge/Service Call | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Hourly Rate for Service | 1 | HR | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Percentage Markup for Parts (please note in comments section) | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Misc. charges (please note in the comment section) any charges not specifically listed here will not be approved for payment, should a purchase order be awarded. Misc. Parts | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Bracket (Hanger) | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Safety Disk CO2 | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Hose Strap | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Gauges | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Nozzle | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Handle Repair | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| Pull Pin | 1 | EA | โ | โ | Fire extinguisher inspection maintenance and repair service |
| New 2.5# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| New 5# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| New 10# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| New 20# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| New 60# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| Recharge 2.5# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| Recharge 5# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| Recharge 10# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| Recharge 20# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| Recharge 50# ABC fire extinguisher | 1 | EA | โ | โ | ABC Fire Extinguishers - Replacements |
| New 5# C02 fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| New 10# C02 fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| New 15# C02 fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| New 20# C02 fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| Recharge 5# C02 fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| Recharge 10# C02 fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| Recharge 15# C02 fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| Recharge 20# C02 fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| Recharge 50# Fire extinguisher | 1 | EA | โ | โ | CO2 Fire Extinguishers - Replacements |
| New 10# Halotron fire extinguisher | 1 | EA | โ | โ | Halotron Fire Extinguishers |
| Recharge 10# Halotron fire extinguisher | 1 | EA | โ | โ | Halotron Fire Extinguishers |
| New 6-liter Type K fire extinguisher | 1 | EA | โ | โ | Type K Fire Extinguishers - Replacements |
| Recharge 6-liter Type K fire extinguisher | 1 | EA | โ | โ | Type K Fire Extinguishers - Replacements |
| Six-year maintenance 2.5# including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance 5# including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance 10# including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance 20# including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance 2.5# dry chemical extinguisher including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance 5# dry chemical extinguisher including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance 10# dry chemical extinguisher including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance 20# dry chemical extinguisher including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance Hydro-test CO2 including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance Hydro-test dry chemical including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Six-year maintenance Hydro-test dry C02 including recharge | 1 | EA | โ | โ | Maintenance/Testing |
| Low hydrostatic pressure testing | 1 | EA | โ | โ | Maintenance/Testing |
| High hydrostatic pressure testing | 1 | EA | โ | โ | Maintenance/Testing |
| Conductivity Test | 1 | EA | โ | โ | Maintenance/Testing |
Get a ready-to-send distributor quote request for these 50 items (copy, CSV or email) and a margin calculator. Sign up free.
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.