| Year | Item | Qty | Unit price | Sold by |
|---|---|---|---|---|
| 2025 | Cisco Systems C9200L-48PXG2Y-EDU Switch |
1 | $5,579.41 | Vendor name |
| 2025 | American Power Conversion SMT1500RM2UC UPS/ Battery Backup |
4 | $712.25 | Vendor name |
| 2025 | Cisco Systems C9136I-B-EDU Access Point |
2 | $1,203.99 | Vendor name |
| 2025 | Cisco Systems C9200L-DNA-A-48-3Y License |
1 | $2,006.64 | Vendor name |
| 2025 | American Power Conversion SMT1500RM2UC UPS/ Battery Backup |
2 | $712.25 | Vendor name |
| 2025 | American Power Conversion SMT1500RM2UC UPS/ Battery Backup |
2 | $712.25 | Vendor name |
| 2025 | American Power Conversion SMT1500RM2UC UPS/ Battery Backup |
1 | $712.25 | Vendor name |
| 2025 | Cisco Systems EDU-DNA-E-5Y License |
2 | $199.62 | Vendor name |
| 2024 | Cisco C9500-32C-EDU Switches |
1 | $17,762.79 | Vendor name |
| 2024 | Cisco Systems C9500-32C-EDU Switch |
1 | $17,762.79 | Vendor name |
| 2024 | Cisco Systems C9500-32C-EDU Switch |
1 | $17,762.79 | Vendor name |
| 2024 | Cisco C9500-32C-EDU Switches |
1 | $17,762.79 | Vendor name |
Responses are due January 15, 2027 at 2:00 PM (local agency time). That is 49 days from today.
Winton, California. It is listed with other open California government bids on BidsNexus.
No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.
NAICS 541511 (Information Technology).
Request for Proposal (RFP) in the Information Technology category.
Responses go through the agency's official posting on publicdata.usac.org. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
| Item | Qty | Unit | AI est. unit price | AI est. total | Category |
|---|---|---|---|---|---|
| Cabling | 500000 | Feet | β | β | Internal Connections |
| Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses | 8 | Each | β | β | Internal Connections |
| Switches and Necessary Software and Licenses | 18 | Each | β | β | Internal Connections |
| Basic Maintenance of Internal Connections: Switches | 18 | Each | β | β | Basic Maintenance of Internal Connections |
| Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses | 9 | Each | β | β | Internal Connections |
| Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses | 1 | Each | β | β | Internal Connections |
| Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses | 1 | Each | β | β | Internal Connections |
| Switches and Necessary Software and Licenses | 14 | Each | β | β | Internal Connections |
| Basic Maintenance of Internal Connections: Switches | 14 | Each | β | β | Basic Maintenance of Internal Connections |
| Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses | 7 | Each | β | β | Internal Connections |
| Switches and Necessary Software and Licenses | 16 | Each | β | β | Internal Connections |
| Basic Maintenance of Internal Connections: Switches | 16 | Each | β | β | Basic Maintenance of Internal Connections |
| Uninterruptable Power Supply/Battery Backup and Necessary Software and Licenses | 7 | Each | β | β | Internal Connections |
| Switches and Necessary Software and Licenses | 16 | Each | β | β | Internal Connections |
| Basic Maintenance of Internal Connections: Switches | 16 | Each | β | β | Basic Maintenance of Internal Connections |
Get a ready-to-send distributor quote request for these 15 items (copy, CSV or email) and a margin calculator. Sign up free.
Sign up free to see the agency name and the original bid posting link, plus the 2 documents, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.