Responses are due November 25, 2026 at 11:00 AM (local agency time). That is 3 days from today.
Maine. It is listed with other open Maine government bids on BidsNexus.
No set-aside is listed on the notice. Check the solicitation documents for vendor registration and eligibility requirements.
NAICS 238220 (Facilities & Maintenance).
Government bid in the Facilities & Maintenance category.
Responses go through the agency's official posting on sam.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
| Item | Qty | Unit | AI est. unit price | AI est. total | Category |
|---|---|---|---|---|---|
| Basic preventive maintenance on chiller systems, Ensemble controls and equipment | 1 | each | โ | โ | Maintenance Services |
| Cooling Seasonal Service | โ | โ | Preventive Maintenance | ||
| Heating Seasonal Service | โ | โ | Preventive Maintenance | ||
| Seasonal Start-up | โ | โ | Preventive Maintenance | ||
| Operating Inspections | โ | โ | Preventive Maintenance | ||
| System Shutdown | โ | โ | Preventive Maintenance | ||
| Annual Seasonal Maintenance | โ | โ | Preventive Maintenance | ||
| Labor and Materials for Covered Equipment | โ | โ | Labor and Materials | ||
| Scheduled Maintenance Labor | โ | โ | Labor | ||
| Scheduled Maintenance Parts and Materials | โ | โ | Parts and Materials | ||
| Repair Labor: Repairs will be performed on covered equipment during Trane regular business hours | โ | โ | Repair Labor | ||
| Repair Parts and Materials | โ | โ | Parts and Materials | ||
| Overtime Repair Labor for Emergency Failures (outside Trane regular business hours) | โ | โ | Repair Labor | ||
| Refrigerant Monitor Inspection. Testing and Calibration once per year | 1 | year | โ | โ | Inspection and Calibration |
| Refrigerant Replacement 0% of Charge per unit per year | โ | โ | Refrigerant Management | ||
| Refrigerant Usage Reporting | โ | โ | Reporting | ||
| Predictive Testing and Analysis for Covered Equipment Chiller(s) Only | โ | โ | Predictive Maintenance | ||
| Spectrographic Oil Analysis | โ | โ | Analysis | ||
| Refrigerant Analysis | โ | โ | Analysis | ||
| KestrelView Analysis | โ | โ | Analysis | ||
| Oil Removal and Disposal by Trane in accordance with EPA Guidelines | โ | โ | Waste Management | ||
| Oil Change | โ | โ | Maintenance | ||
| Air-cooled condenser coil cleaning once per year | 1 | year | โ | โ | Cleaning |
| Clean Cooling Tower(s) once per year | 1 | year | โ | โ | Cleaning |
| Condenser Tube Cleaning & Evap Tube Cleaning once per year | 1 | year | โ | โ | Cleaning |
| Starter Maintenance 600 volt volt starter | โ | โ | Maintenance | ||
| Eddy Current Test of tubes every 2 years | 1 | 2 years | โ | โ | Testing |
| Chiller overhaul every 5 years | 1 | 5 years | โ | โ | Overhaul |
Get a ready-to-send distributor quote request for these 28 items (copy, CSV or email) and a margin calculator. Sign up free.
Sign up free to see the agency name and the original bid posting link, plus the 1 document, contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.