Responses are due December 4, 2026 at 11:00 AM (local agency time). That is 14 days from today.
Tennessee. It is listed with other open Tennessee government bids on BidsNexus.
The notice sets this opportunity aside for small business businesses. Confirm eligibility in the solicitation documents.
NAICS 333923 (Manufacturing).
Request for Information (RFI) in the Manufacturing category.
Responses go through the agency's official posting on sam.gov. BidsNexus links to the original solicitation and its documents; a free account shows the link and emails you similar bids.
Most recent contracts from Department of the Army under NAICS 333923, last 3 years. Typical award: $104K.
| KUK JE SANG SA | $104K | Sep 2026 | 1st exercised option year - hoist, overhead crane, and sling inspection, test, pm, and re⦠details |
| U.S. MATERIALS HANDLING CORPORATION | $92K | Jul 2026 | S2p2: gantry crane: solicitation: w911s226u3536 details |
| AMERICAN MATERIAL HANDLING, INC. | $16K | Jul 2026 | Scissor lift details |
| CRC CRANE, INC. | $455K | Jun 2026 | Delivery and installation of seven (7) each independent gantry crane systems with 1000 lb⦠details |
| ATLAS TOYOTA MATERIAL HANDLING, LLC | $149K | Jun 2026 | 6k forklift diesel details |
Source: USAspending.gov. Similar work, not necessarily this exact contract.
| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Rehabilitation of 250-ton powerhouse bridge crane | 1 | each | β | β | Crane Rehabilitation |
| Modify personnel access and implement safety improvements to bridge crane walkways, ladders, and maintenance platforms | 1 | each | β | β | Safety & Access |
| Replace hoist motor output shaft brake wheel coupling seals | 1 | each | β | β | Couplings & Seals |
| Replace hoist brake pads and perform comprehensive service to restore proper brake gap and operational torque | 1 | each | β | β | Braking Systems |
| Clean speed reducers (main hoist, auxiliary hoist, bridge drive, and trolley drive) and replace all lubricating oil; inspect and repair grease lubrication lines; replace main hoist open gear oil | 1 | each | β | β | Gearboxes & Lubrication |
| Modify bridge and trolley wheel assemblies to replace original wheel bushings with new anti-friction roller bearings (option to replace entire wheel and axle assemblies or modify and reuse existing wheels and axles) | 1 | each | β | β | Wheel & Axle Assemblies |
| Provide new, and perform non-destructive inspection, proof-load testing, and painting of below-the-hook lifting devices | 1 | each | β | β | Below-the-Hook Devices |
| Upgrade all variable frequency drives (VFDs) to Magnetek Series 5 VFDs (or approved system equal) | 1 | each | β | β | Drives & Automation |
| Furnish and install a new fourth conductor bar dedicated as a continuous ground conductor; modify existing collectors to connect to the fourth conductor bar | 1 | each | β | β | Electrification & Grounding |
| Provide and install a new ergonomic operator's chair, wireless radio remote controllers, absolute hoist encoders, and high-efficiency LED bridge crane lights | 1 | each | β | β | Operator Cab & Controls |
| Install load cell weighing devices and displays for both main and auxiliary hoists, along with new heavy-duty limit switches for bridge and trolley travel | 1 | each | β | β | Safety Instrumentation & Limits |
| Furnish and install a new auxiliary tool hoist and a dedicated personnel rescue hoist | 1 | each | β | β | Auxiliary Hoists |
| Perform full operational testing of all mechanical and electrical features of the crane, followed by 100% rated and 125% rated load tests in accordance with CMAA and OSHA requirements | 1 | each | β | β | Testing & Commissioning |
| Develop and deliver a comprehensive new Operation and Maintenance (O&M) Manual integrating all legacy data from the existing manual with new equipment data | 1 | each | β | β | Documentation |
| Provide new main and auxiliary lower load block assemblies | 1 | each | β | β | Blocks, Sheaves & Lifting Beams |
| Provide new main and auxiliary upper sheaves and pins | 1 | each | β | β | Blocks, Sheaves & Lifting Beams |
| Provide new main hoist lifting beam, rotor lifting device, and turbine shaft lifting device | 1 | each | β | β | Blocks, Sheaves & Lifting Beams |
| Survey and modify existing runway crane rails to correct rail span, elevation, and straightness along the entire runway length | 1 | each | β | β | Crane Runway Rails |
Sign up free to see the agency name and the original bid posting link, plus contracting-officer contacts and AI response outlines. Every feature is free through December 31, 2026.